- Click on the Tools module (1).
- Click on Processes tab (2) to display its contents.
- In the Commission box, press on Calculate (3) button. The system performs a full calculation of all the Commissions defined in the system.
- If the calculation has completed successfully, an appropriate message [Completed Successfully] is shown in a green banner at the right-hand side of the screen.
- Click on Organization (5) tab. The Organization screen is shown. In Employees tab, see the results in the Incentives column.
- In case of error in the Data Element calculation result, an Error message is displayed in a green banner at the right-hand side of the screen.
- In case of error in the Commission calculation result, press on Errors (4) button. A list of most probable source of errors is listed below Commission box.
Comments